HOW WE MANAGE THE DESIGN
Price the decisions, not the drawings.
The biggest cost decisions are made at concept. The standard sequence prices them after they're drawn. Hi-Resi prices them where they're made.
- 01 See it.A detailed blue-sky and conceptual intent package, built with your architect, before costly drawing sets.
- 02 Price it.A cost range, every assumption written.
- 03 Test it.Key trades weigh in while it can still change.
- 04 Then draw it.Design moves ahead with the targets set.
Every redraw costs time, and time raises prices. It ends in value engineering or a bigger check.
Then through construction: builder selection, buyout, every pay application, the site walked.